Error loading player: No playable sources found

Case Study Moving from a RABS to an Isolator

Date
March 17, 2025
Explore related products in the following collection:
Thumbnail for 2025 ISPE Aseptic Conference
The 2025 ISPE Aseptic Conference serves as a platform where the newest developments in aseptic processing, robotics, and automation are explored in depth. It addresses the complex challenges associated with sterilizing small-batch aseptic products and accelerating their time-to-market…

A case study of a CDMO, MilliporeSigma, moving from an aging RABS filling line to a SKAN/Bausch & Strobel Varyosis isolator line per Annex 1. This presentation will review challenges and successes with installing, validating and implementing a new isolator filling line including strategic regulatory filing strategies to assess moving commerical and clinical clients from the RABS to the isolator. A panel presentation with the manufacturing site, sterility assurance consultant supporting line aseptic readiness, Jeff Yuen (former FDA) regulatory strategy, and Merritt Postma SKAN isolator vendor. Improved contamination control strategy results of validation and readiness of the isolator line will be reviewed.

Speakers

Speaker Image for Jason Vaughn
Site Head of Technical Operations, MilliporeSigma Exelead
Speaker Image for Marsha Steed
Founder and President / Sr, Consultant, Steed MicroBio LLC / JYA
Speaker Image for Merritt Postma
Executive Director North American Sales, SKAN US, Inc.

Related Products

Thumbnail for Advanced Aseptic Fill Technology: Case Study & Future
Advanced Aseptic Fill Technology: Case Study & Future
The state of aseptic filling technology has been in a relative plateau in recent years, but there have been new novel technical advancements recently implemented for low speed, small batch applications…
Thumbnail for Case Study: A New Benchmark for Aseptic Manufacturing
Case Study: A New Benchmark for Aseptic Manufacturing
Explore the future of aseptic manufacturing firsthand with a virtual tour of Kindeva's state-of-the-art Bridgeton, Missouri facility. Recently completed in 2024, this cutting-edge sterile fill-finish site spans over 155,000 sq. ft…
Thumbnail for Isolator line with Real-time Viable Environmental Monitoring
Isolator line with Real-time Viable Environmental Monitoring
ISOLATOR FILLING LINE WITH CONVENTIONAL AND REAL-TIME VIABLE ENVIRONMENTAL MONITORING